What you need

  • The points: easting, northing and R.L. of each, as the total station or GNSS controller exports them. Here, four points from a small survey:
Point Easting Northing R.L.
1 0.000 0.000 100.200
2 30.000 0.000 101.150
3 28.000 25.000 101.800
4 4.000 20.000 100.600
  • The contour interval: the height from one contour to the next. Here 0.25 m, with a major (bold, labelled) contour every 1 m.

Step 1: join the points into triangles

Between surveyed points the ground is taken as flat: inside each triangle, it is the plane through the triangle’s three corners. So the triangles decide every level between the points.

Four points can be joined two ways, along the diagonal 1–3 or along 2–4. The rule surveying software uses is the Delaunay rule: no point may lie inside the circle through a triangle’s three corners. It gives the triangles closest to equilateral, so each level comes from the nearest points.

  • Triangle 1-2-3: point 4 lies inside the circle through points 1, 2 and 3, so this triangle breaks the rule.
  • Triangle 1-2-4: point 3 lies outside its circle, and triangle 2-3-4 leaves point 1 outside. These two are the triangles.

The network is 1-2-4 and 2-3-4, joined along 2–4.

It matters. The ground at E 16.000, N 12.000 comes out at 100.890 on these triangles (worked out below), but at 101.049 had the points been joined along 1–3: 0.16 m different, from the same four levels.

Step 2: list the contour levels

The contours are the multiples of the interval between the lowest and highest points. The points run from 100.200 to 101.800, so at 0.25 m the levels are:

100.25, 100.50, 100.75, 101.00, 101.25, 101.50, 101.75

Only 101.00 is a whole metre, so it is the one major contour.

Step 3: find where each level crosses the triangle sides

A contour level L crosses a triangle side whose two ends are on either side of it, one below L and one above. Along the side from corner 1 (level z₁) to corner 2 (level z₂), it crosses at the fraction

s = (L − z₁) ÷ (z₂ − z₁)

of the way along, so at E = E₁ + s × (E₂ − E₁) and N = N₁ + s × (N₂ − N₁). This is the same straight-line interpolation you would do between two spot levels on paper.

The 101.00 contour. In triangle 1-2-4, point 1 (100.200) and point 4 (100.600) are below 101.00, and point 2 (101.150) is above, so it crosses sides 1–2 and 2–4:

  • Side 1–2: s = (101.00 − 100.20) ÷ (101.15 − 100.20) = 0.80 ÷ 0.95 = 0.8421. E = 0 + 0.8421 × 30 = 25.263, N = 0.000.
  • Side 2–4: s = (101.00 − 101.15) ÷ (100.60 − 101.15) = 0.15 ÷ 0.55 = 0.2727. E = 30 + 0.2727 × (4 − 30) = 22.909, N = 0 + 0.2727 × 20 = 5.455.

In triangle 2-3-4, point 4 is below and points 2 and 3 are above, so it crosses sides 2–4 (the same point as above) and 3–4:

  • Side 3–4: s = (101.00 − 101.80) ÷ (100.60 − 101.80) = 0.80 ÷ 1.20 = 0.6667. E = 28 + 0.6667 × (4 − 28) = 12.000, N = 25 + 0.6667 × (20 − 25) = 21.667.

Step 4: join the crossings

Inside each triangle the contour is a straight line between its two crossings, and neighbouring triangles share the crossing on their common side. So the 101.00 contour runs (25.263, 0.000) → (22.909, 5.455) → (12.000, 21.667).

Every level worked the same way:

Level Points of the contour (E, N)
100.25 (1.579, 0.000) → (0.500, 2.500)
100.50 (9.474, 0.000) → (3.000, 15.000)
100.75 (17.368, 0.000) → (11.091, 14.545) → (7.000, 20.625)
101.00 (25.263, 0.000) → (22.909, 5.455) → (12.000, 21.667)
101.25 (29.692, 3.846) → (17.000, 22.708)
101.50 (28.923, 13.462) → (22.000, 23.750)
101.75 (28.154, 23.077) → (27.000, 24.792)

Contours of different levels never cross: inside each triangle they are parallel straight lines.

Step 5: label and smooth

Label the major contours with their level, and break the line under the text. Contours are often drawn smoothed, as curves rather than straight pieces. A good smoothing passes through every crossing worked out in step 3, so the true levels stay where they are, and it is drawing only: volumes and levels are still worked out on the triangles.

The level at any point

Inside a triangle the ground is a plane, so the level anywhere follows from the three corners. Measured from the first corner, with x, y and h the differences in easting, northing and level to the other two:

  • d = x₂ × y₃ − x₃ × y₂
  • b = (h₂ × y₃ − h₃ × y₂) ÷ d, the rise per metre east
  • c = (x₂ × h₃ − x₃ × h₂) ÷ d, the rise per metre north
  • z = z₁ + b × (E − E₁) + c × (N − N₁)

E 16.000, N 12.000 is in triangle 2-3-4. From point 2: x₂ = −2, y₂ = 25, h₂ = 0.65 (to point 3); x₃ = −26, y₃ = 20, h₃ = −0.55 (to point 4).

  • d = (−2 × 20) − (−26 × 25) = 610
  • b = (0.65 × 20 − (−0.55) × 25) ÷ 610 = 0.04385
  • c = ((−2) × (−0.55) − (−26) × 0.65) ÷ 610 = 0.02951
  • z = 101.150 + 0.04385 × (16 − 30) + 0.02951 × 12 = 100.890

(These figures were worked with the same formulas CivilSurvey Expert uses, and checked by calculation.)

Things to watch

  • Survey drains, bank tops and road edges as lines. Give their points one code and join them as a breakline, a line no triangle may cross. Without it, a triangle can join the bed of a drain to the top of its bank and fill the drain in on the contour map.
  • Don’t contour ground nobody surveyed. At the edges of a survey, the triangles reach across bays and gaps with long, thin sides. Leave those triangles out rather than draw contours across them.
  • Choose an interval the survey supports. Contours every 0.10 m from points 20 m apart show detail that was never measured.
  • Check a few contours against spot levels. A contour should never run past a point that is clearly above or below its level.

Once the triangles are right, the same surface gives the earthwork: see cut and fill for site levelling and tank capacity from contours.