VectorExpert
CH 0+000

Home · Projects · Railways

Railway formation and ballast, section by section along the whole route.

Draw the formation and the ballast once, place them along the route by gradient, and CivilSurvey Expert gives the cut and fill for the formation and the quantity of ballast at every chainage, with the long section at its own scale. Long routes are handled the same way as short ones: step through the chainages, print them all at once, and take the volume abstract to Excel. CAD is built in, so no AutoCAD is needed.

LayersSubgrade, blanket, ballast
Long sectionOwn scale, 1:1000 × 1:100 by default
GradientSet in percent on the design sheet
CH 0+050

Typical section

The typical railway section

Design the formation in the Template Designer's railway type. Its subgrade, blanket and ballast come in as layers of their own, each with its own quantity.

Typical railway formation sectionA railway embankment: formation fill on the natural surface with side slopes to toe points, a ballast section on the formation leaving a cess on each side, and the track on the ballast.CLFormationBallastTrackCessNatural surface (NSL)Toe point1 V : 2 H

Schematic, not to scale.

Natural surface (NSL)
The ground, from the level book at every chainage.
Formation
The embankment or cutting up to formation level, with side slopes run out to the ground.
Ballast
The ballast section on the formation, quantified as its own layer.
Blanket
The blanket between the subgrade and the ballast, from the same template and with its own quantity.
CH 0+100

The job, start to finish

A railway job in six stages

The same six stages as every CivilSurvey Expert project. Each links to the full details and a live demo.

  1. 01

    Book the levels

    Type or import the level book for every chainage along the route. R.L.s are worked out by the height-of-instrument method and checked arithmetically; sections can be interpolated at a regular interval.

  2. 02

    Generate the sections

    Place the railway template on every chainage: give the level at the template centre and the gradient as 1 in N or a percent, and the level at each chainage follows. Side slopes run out to the ground and the toe points are found for you.

  3. 03

    Adjust by hand

    Ease a slope, change the slope set through a cutting, or move points in the built-in CAD. Cut, fill and toe points update as you work.

  4. 04

    Adjust to a target

    When a section has to carry a given cut or fill area, Adjust to a target area moves the layer in small steps until the area is reached, with a preview before anything changes.

  5. 05

    Reverse field book

    Back calculate the staff readings, B.S., I.S. and F.S., from the final levels for setting out, with change points added at staff limits.

  6. 06

    Deliver

    Print every section with its datum band and area table, the long section at its own scale, and the volume abstract for the formation and the ballast.

CH 0+200

What you hand over

From one project file

OutputWhat it holds
Cross-section sheetsEvery chainage on A0 to A5 or Letter, or as a PDF, with your title block, with the datum band and the area table for each layer.
Long sectionThe ground, formation and ballast along the whole route, at its own horizontal and vertical scale.
Volume abstractCut and fill for the formation and the ballast quantity by average end area or prismoidal, to Excel, print or PDF.
Setting-out readingsStaff readings back-calculated from the final levels, in a field book that checks arithmetically.
DWG or DXF drawingsAny section, or every section on one drawing, exported for a consultant who asks for it.
CH 0+300

Common questions about railways

Can I get the ballast quantity separately from the earthwork?

Yes. The ballast is its own layer with its own area against the formation, so the volume abstract gives it separately from the formation cut and fill.

How do I enter a gradient of 1 in 200?

Directly: when you place the template, set the level at the template centre by gradient and choose 1 in N. The design sheet shows it as a percent (1 in 200 is 0.5 %).

Can the long section use a different scale from the cross-sections?

Yes. Cross and long sections have separate scales: 1:100 × 1:100 and 1:1000 × 1:100 by default, both changeable.

Does it handle long routes with many sections?

Yes. Every chainage is in one project file; move through them from the chainage list, print the whole route from Print Sections, and take the volume abstract to Excel in one go.

Can I add a blanket or sub-ballast layer?

Yes. The railway template's subgrade, blanket and ballast are layers of their own, and a section holds as many layers as you need, each with its own quantity.

Do I need AutoCAD to draw or print the sections?

No. Sections are drawn and printed in CivilSurvey Expert's built-in CAD. Export DWG only when someone else needs the drawings.

CH 0+400